Investigação Operacional

 ISSN 0874-5161

SELLITTO, Miguel Afonso; RIBEIRO, José Luis Duarte    PETRILLO, Fabiano. Modelo não-linear de longo prazo para a potência requerida do sistema brasileiro de eletricidade . []. , 27, 1, pp.1-20. ISSN 0874-5161.

^len^aThe formerly closed Brazilian electrical energy market has been disclosed for investors and domestic consumers, which now have choices for theirs decisions concerning energy sales and purchasing, in long-term contracts. To establish minimal planning condition, suppliers need to forecast the required load in order to project and operate power plants. With the aid of a method that integrates non-linear regression and soft-system methodology, we depict a non-linear model for the gross total electric power requirement, counting on domestic activity, population and human developing index. A goodness-of-fit better then 96% was achieved. The final analysis focused on the strong contingency period occurred in Brazil in 2001.^lpt^aO mercado brasileiro de energia elétrica abriu-se recentemente a investidores e consumidores, que agora têm opções de longo prazo para compra e venda de energia. Para que haja condições mínimas de planejamento neste mercado, é necessário um modelo de longo prazo capaz de prever as necessidades futuras de suprimento de energia elétrica. Por meio de um método que integra regressão não-linear múltipla com SSM (soft system methodology), foi proposto um modelo para o requisito de potência, calculado a partir do nível de atividade negocial brasileira, do total de população e de seu nível de desenvolvimento humano. O ajuste obtido pelo modelo foi superior a 96%. Uma análise final focou no período de contingenciamento de oferta de energia ocorrido no Brasil em 2001, conhecido como apagão.

: electrical power; multiple nonlinear regression; multivariate data analysis; SSM; long-term load forecasting.

        · | |     · |     · ( pdf )