SciELO - Scientific Electronic Library Online

 
vol.23 número1Um modelo de programação matemática aplicado ao sector agrícola portuguêsAvaliação da interiorização dos cursos da Universidade Federal Fluminense com o uso conjugado dos métodos UTA e MACBETH índice de autoresíndice de assuntosPesquisa de artigos
Home Pagelista alfabética de periódicos  

Serviços Personalizados

Journal

Artigo

Indicadores

Links relacionados

  • Não possue artigos similaresSimilares em SciELO

Compartilhar


Investigação Operacional

versão impressa ISSN 0874-5161

Resumo

LOPES, Isabel da Silva  e  LEITAO, Armando Luís Ferreira. Optimal number of spare and optimal interval between overhauls for equipment group. Inv. Op. [online]. 2003, vol.23, n.1, pp.35-48. ISSN 0874-5161.

Any equipment during operation can fail or degrade with time. Therefore, it's necessary to act on them to make repair when failure eventually occurs or, to avoid failure occurrence and their consequences. The objective of preventive maintenance is to reduce the probability of failure in time period after maintenance has been applied. Concerning corrective maintenance, the objective is to reduce the severity of occurrence of breakdowns and to restore systems to normal operating conditions in short time interval. This paper, entitled "Optimal number of spare and optimal interval between overhauls for equipment group", seeks a model that allows determining a maintenance policy, which combines preventive and corrective maintenance in order to minimise maintenance costs. The proposed maintenance policy will allow to avoid or reduce the consequences of equipment breakdowns on production, trough spare availability; and additionally, to decrease failure occurrence through regular equipment maintenance. In many cases, optimisation models are not applied due to lack of data. To enable the application of the proposed model, a computational application has been developed to calculate model unknown variables, and moreover it will allow to record data which will be used for further analysis and, to estimate equipment lifetime failure distribution.

Palavras-chave : Reliability; Preventive maintenance; Overhaul, Replacement.

        · resumo em Português     · texto em Português     · Português ( pdf )