SciELO - Scientific Electronic Library Online

 
vol.24 número2Planejamento e Programação da Produção numa Fundição Cativa Automatizada de Grande PorteGraph-Based Structures for the Market Baskets Analysis índice de autoresíndice de materiabúsqueda de artículos
Home Pagelista alfabética de revistas  

Servicios Personalizados

Revista

Articulo

Indicadores

Links relacionados

  • No hay articulos similaresSimilares en SciELO

Compartir


Investigação Operacional

versión impresa ISSN 0874-5161

Resumen

OLIVEIRA, José António; CARVALHO, M.ª Sameiro de  y  CARVALHO, J. M. Valério de. Scheduling variable processing time operations in systems with buffers. Inv. Op. [online]. 2004, vol.24, n.2, pp.211-231. ISSN 0874-5161.

In this work a scheduling operation problem with variable processing times is analysed. In particular this project is concerned with the scheduling of the truck load operations and the preparation of loads in buffers in an automatic warehouse. The truck load operations can be assumed as processing tasks with ready times (availability of the trucks) and due dates (trip cut off time). Additionally, it is possible to process a task before ready time by using a buffer where a truck load is assembled to be transferred to the truck in a later time period. Processing time is variable and depends upon the number of tasks simultaneously in progress. A minimum number of simultaneous tasks is assumed in order to guarantee a maximum, nominal, rate of expedition. A procedure based on Dynamic Programming with truck expedition times ordered by EDD rule is presented. The algorithm efficiency is also discussed.

Palabras clave : Logistics; Scheduling; Warehousing.

        · resumen en Portugués     · texto en Portugués     · Portugués ( pdf )